{"id":104131,"date":"2023-01-31T16:57:19","date_gmt":"2023-01-31T15:57:19","guid":{"rendered":"https:\/\/aeeolica.org\/?p=104131"},"modified":"2023-03-10T11:54:52","modified_gmt":"2023-03-10T10:54:52","slug":"ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon","status":"publish","type":"post","link":"https:\/\/aeeolica.org\/en\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\/","title":{"rendered":"GE Renewable Energy refuerza su posici\u00f3n en Espa\u00f1a mediante un nuevo acuerdo con Repsol para instalar 133 MW en Arag\u00f3n\u00a0"},"content":{"rendered":"\n<ul class=\"wp-block-list\">\n<li>GE Renewable Energy suministrar\u00e1 22 aerogeneradores Cypress de 6.1 MW de potencia, el modelo de GE m\u00e1s potente instalado en Espa\u00f1a.<\/li>\n\n\n\n<li>Tanto las torres como las palas de los aerogeneradores ser\u00e1n de fabricaci\u00f3n espa\u00f1ola.<\/li>\n\n\n\n<li>GE Renewable Energy ha instalado m\u00e1s de 400 MW con Repsol en Espa\u00f1a.<\/li>\n<\/ul>\n\n\n\n<p><strong>Madrid, 18 de noviembre de 2022<\/strong> \u2013 GE Renewable Energy ha sido seleccionada por Repsol para suministrar 22 unidades de su plataforma Cypress, los aerogeneradores de GE m\u00e1s potentes instalados en Espa\u00f1a, a seis de los parques e\u00f3licos de su proyecto Delta II (Santa Cruz I, Amp, II, III, y San Isidro I y II), en la comunidad aut\u00f3noma de Arag\u00f3n.<\/p>\n\n\n\n<p>Estos seis parques tendr\u00e1n una capacidad total de 133MW y podr\u00e1n suministrar energ\u00eda a m\u00e1s de 100.000 viviendas. El proyecto Delta II es el mayor proyecto renovable de Repsol que se encuentra ahora mismo en construcci\u00f3n, con una capacidad total de 860 MW.<\/p>\n\n\n\n<p>Las palas de la turbina e\u00f3lica Cypress se fabricar\u00e1n por la filial de palas de aerogeneradores de GE, LM Wind Power, que opera desde Ponferrada (Le\u00f3n) y Castell\u00f3n en Espa\u00f1a. Las torres de los aerogeneradores tambi\u00e9n se producir\u00e1n en Espa\u00f1a, mientras que las nacelles se producir\u00e1n en Salzbergen, Alemania.<\/p>\n\n\n\n<p>Blanca Monteagudo, directora comercial de GE Renewable Energy, Onshore Wind para el Sur de Europa, ha comentado: \u201c<em>Nos enorgullece contribuir al desarrollo de la industria e\u00f3lica en Espa\u00f1a y en concreto en la regi\u00f3n de Arag\u00f3n, d\u00f3nde reforzamos nuestra apuesta mediante este proyecto con Repsol. De esta manera, avanzamos hacia nuestra visi\u00f3n para suplir el incremento de demanda de la electricidad en el mundo, mientras que contribuimos a alcanzar sus objetivos de descarbonizaci\u00f3n\u2019.<\/em><\/p>\n\n\n\n<p><em>\u201cEste nuevo acuerdo con GE Renewable Energy es un paso m\u00e1s para cumplir con nuestro ambicioso objetivo de alcanzar 6 GW de energ\u00edas renovables en 2025 y 20 GW en 2030. Las renovables son clave en la estrategia de descarbonizaci\u00f3n de Repsol, que se ha marcado el reto de convertirse en empresa cero emisiones netas en 2050\u201d, comenta <\/em>Enrique Pedrosa, Director de Operaciones (COO) para Europa y Latinoam\u00e9rica del negocio de Generaci\u00f3n Baja en Carbono de Repsol.&nbsp;<\/p>\n\n\n\n<p>GE Renewable Energy se compromete a facilitar la transici\u00f3n energ\u00e9tica apoyando el trabajo de sus clientes. En Espa\u00f1a, GE es uno de los fabricantes l\u00edderes en el mercado, con m\u00e1s de 4.6GW de potencia instalada. Hasta la fecha, la compa\u00f1\u00eda ha instalado 400 MW con Repsol en el pa\u00eds.<\/p>\n\n\n\n<p><strong>Sobre GE Renewable Energy<\/strong><\/p>\n\n\n\n<p>GE Renewable Energy, parte integral del porfolio de negocios de energ\u00eda de GE Vernova, cuenta con uno de los porfolios m\u00e1s amplios de la industria de la energ\u00eda renovable e ingresos de 16.000 millones de d\u00f3lares anuales. La compa\u00f1\u00eda proporciona soluciones integrales a sus clientes que demandan energ\u00eda verde fiable y asequible.<\/p>\n\n\n\n<p>Combinando e\u00f3lica terrestre y marina, palas, hidroel\u00e9ctrica, almacenamiento, solar a gran escala y soluciones de redes el\u00e9ctricas, as\u00ed como ofertas de energ\u00edas renovables h\u00edbridas y servicios digitales, GE Renewable Energy ha instalado m\u00e1s de 400 gigavatios de energ\u00eda renovable y ha equipado a m\u00e1s del 90 por ciento de las el\u00e9ctricas de todo el mundo con sus soluciones de redes el\u00e9ctricas. Con casi 40.000 empleados presentes en m\u00e1s de 80 pa\u00edses, GE Renewable Energy crea valor para los clientes que buscan proporcionar energ\u00eda al mundo con electrones verdes asequibles, fiables y sostenibles.<\/p>\n\n\n\n<p>GE Vernova integra negocios de Energ\u00eda, Renovables, Digital y de Servicios Financieros de Energ\u00eda, y tiene como objetivo apoyar la transformaci\u00f3n de nuestros clientes durante el proceso de transici\u00f3n energ\u00e9tica global.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.repsol.com\/content\/dam\/repsol-corporate\/es\/sala-de-prensa\/documentos-notas-de-prensa\/2022\/np161222-repsol-asterion-energies.pdf\" target=\"_blank\" rel=\"noreferrer noopener\"><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>GE Renewable Energy suministrar\u00e1 22 aerogeneradores Cypress de 6.1 MW de potencia, el modelo de GE m\u00e1s potente instalado en Espa\u00f1a.<\/p>\n","protected":false},"author":2,"featured_media":104129,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[450],"tags":[],"class_list":["post-104131","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-newsletter-enero-2023"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>GE Renewable Energy refuerza su posici\u00f3n en Espa\u00f1a mediante un nuevo acuerdo con Repsol para instalar 133 MW en Arag\u00f3n\u00a0 - Asociaci\u00f3n Empresarial E\u00f3lica<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/aeeolica.org\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"GE Renewable Energy refuerza su posici\u00f3n en Espa\u00f1a mediante un nuevo acuerdo con Repsol para instalar 133 MW en Arag\u00f3n\u00a0 - Asociaci\u00f3n Empresarial E\u00f3lica\" \/>\n<meta property=\"og:description\" content=\"GE Renewable Energy suministrar\u00e1 22 aerogeneradores Cypress de 6.1 MW de potencia, el modelo de GE m\u00e1s potente instalado en Espa\u00f1a.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/aeeolica.org\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\/\" \/>\n<meta property=\"og:site_name\" content=\"Asociaci\u00f3n Empresarial E\u00f3lica\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/aeeolica\" \/>\n<meta property=\"article:published_time\" content=\"2023-01-31T15:57:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-03-10T10:54:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/aeeolica.org\/wp-content\/uploads\/2023\/01\/Photo-by-Borja-Fasi-Fernandez_-NPI-Field-Engineer_GE-Renewable-Energy-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Morante D\u00edaz, Mar\u00eda del Mar\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@aeeolica\" \/>\n<meta name=\"twitter:site\" content=\"@aeeolica\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Morante D\u00edaz, Mar\u00eda del Mar\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/aeeolica.org\\\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/aeeolica.org\\\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\\\/\"},\"author\":{\"name\":\"Morante D\u00edaz, Mar\u00eda del Mar\",\"@id\":\"https:\\\/\\\/aeeolica.org\\\/#\\\/schema\\\/person\\\/064b26f21f7ed52e0b3854e6b52f9772\"},\"headline\":\"GE Renewable Energy refuerza su posici\u00f3n en Espa\u00f1a mediante un nuevo acuerdo con Repsol para instalar 133 MW en Arag\u00f3n\u00a0\",\"datePublished\":\"2023-01-31T15:57:19+00:00\",\"dateModified\":\"2023-03-10T10:54:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/aeeolica.org\\\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\\\/\"},\"wordCount\":650,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/aeeolica.org\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/aeeolica.org\\\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/aeeolica.org\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/Photo-by-Borja-Fasi-Fernandez_-NPI-Field-Engineer_GE-Renewable-Energy-scaled.jpg\",\"articleSection\":[\"Newsletter Enero 2023\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/aeeolica.org\\\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/aeeolica.org\\\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\\\/\",\"url\":\"https:\\\/\\\/aeeolica.org\\\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\\\/\",\"name\":\"GE Renewable Energy refuerza su posici\u00f3n en Espa\u00f1a mediante un nuevo acuerdo con Repsol para instalar 133 MW en Arag\u00f3n\u00a0 - Asociaci\u00f3n Empresarial E\u00f3lica\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/aeeolica.org\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/aeeolica.org\\\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/aeeolica.org\\\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/aeeolica.org\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/Photo-by-Borja-Fasi-Fernandez_-NPI-Field-Engineer_GE-Renewable-Energy-scaled.jpg\",\"datePublished\":\"2023-01-31T15:57:19+00:00\",\"dateModified\":\"2023-03-10T10:54:52+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/aeeolica.org\\\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/aeeolica.org\\\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/aeeolica.org\\\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\\\/#primaryimage\",\"url\":\"https:\\\/\\\/aeeolica.org\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/Photo-by-Borja-Fasi-Fernandez_-NPI-Field-Engineer_GE-Renewable-Energy-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/aeeolica.org\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/Photo-by-Borja-Fasi-Fernandez_-NPI-Field-Engineer_GE-Renewable-Energy-scaled.jpg\",\"width\":2560,\"height\":1440,\"caption\":\"default\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/aeeolica.org\\\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/aeeolica.org\\\/en\\\/inicio\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"GE Renewable Energy refuerza su posici\u00f3n en Espa\u00f1a mediante un nuevo acuerdo con Repsol para instalar 133 MW en Arag\u00f3n\u00a0\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/aeeolica.org\\\/#website\",\"url\":\"https:\\\/\\\/aeeolica.org\\\/\",\"name\":\"Asociaci\u00f3n Empresarial E\u00f3lica\",\"description\":\"AEE Asociaci\u00f3n Empresarial E\u00f3lica\",\"publisher\":{\"@id\":\"https:\\\/\\\/aeeolica.org\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/aeeolica.org\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/aeeolica.org\\\/#organization\",\"name\":\"Asociaci\u00f3n Empresarial E\u00f3lica\",\"url\":\"https:\\\/\\\/aeeolica.org\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/aeeolica.org\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/aeeolica.org\\\/wp-content\\\/uploads\\\/2021\\\/08\\\/logo-aee.png\",\"contentUrl\":\"https:\\\/\\\/aeeolica.org\\\/wp-content\\\/uploads\\\/2021\\\/08\\\/logo-aee.png\",\"width\":180,\"height\":78,\"caption\":\"Asociaci\u00f3n Empresarial E\u00f3lica\"},\"image\":{\"@id\":\"https:\\\/\\\/aeeolica.org\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/aeeolica\",\"https:\\\/\\\/x.com\\\/aeeolica\",\"https:\\\/\\\/www.instagram.com\\\/aeeolica\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/aee-asociaci\u00f3n-empresarial-e\u00f3lica-6830946b\\\/\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/AEEolica\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/aeeolica.org\\\/#\\\/schema\\\/person\\\/064b26f21f7ed52e0b3854e6b52f9772\",\"name\":\"Morante D\u00edaz, Mar\u00eda del Mar\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8bfd23e1c4bf5aa0b9314f1c5c9d644e62672831e6a512513954c3f15dffdd5a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8bfd23e1c4bf5aa0b9314f1c5c9d644e62672831e6a512513954c3f15dffdd5a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8bfd23e1c4bf5aa0b9314f1c5c9d644e62672831e6a512513954c3f15dffdd5a?s=96&d=mm&r=g\",\"caption\":\"Morante D\u00edaz, Mar\u00eda del Mar\"},\"url\":\"https:\\\/\\\/aeeolica.org\\\/en\\\/author\\\/mar\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"GE Renewable Energy refuerza su posici\u00f3n en Espa\u00f1a mediante un nuevo acuerdo con Repsol para instalar 133 MW en Arag\u00f3n\u00a0 - Asociaci\u00f3n Empresarial E\u00f3lica","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/aeeolica.org\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\/","og_locale":"en_US","og_type":"article","og_title":"GE Renewable Energy refuerza su posici\u00f3n en Espa\u00f1a mediante un nuevo acuerdo con Repsol para instalar 133 MW en Arag\u00f3n\u00a0 - Asociaci\u00f3n Empresarial E\u00f3lica","og_description":"GE Renewable Energy suministrar\u00e1 22 aerogeneradores Cypress de 6.1 MW de potencia, el modelo de GE m\u00e1s potente instalado en Espa\u00f1a.","og_url":"https:\/\/aeeolica.org\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\/","og_site_name":"Asociaci\u00f3n Empresarial E\u00f3lica","article_publisher":"https:\/\/www.facebook.com\/aeeolica","article_published_time":"2023-01-31T15:57:19+00:00","article_modified_time":"2023-03-10T10:54:52+00:00","og_image":[{"width":2560,"height":1440,"url":"https:\/\/aeeolica.org\/wp-content\/uploads\/2023\/01\/Photo-by-Borja-Fasi-Fernandez_-NPI-Field-Engineer_GE-Renewable-Energy-scaled.jpg","type":"image\/jpeg"}],"author":"Morante D\u00edaz, Mar\u00eda del Mar","twitter_card":"summary_large_image","twitter_creator":"@aeeolica","twitter_site":"@aeeolica","twitter_misc":{"Written by":"Morante D\u00edaz, Mar\u00eda del Mar","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/aeeolica.org\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\/#article","isPartOf":{"@id":"https:\/\/aeeolica.org\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\/"},"author":{"name":"Morante D\u00edaz, Mar\u00eda del Mar","@id":"https:\/\/aeeolica.org\/#\/schema\/person\/064b26f21f7ed52e0b3854e6b52f9772"},"headline":"GE Renewable Energy refuerza su posici\u00f3n en Espa\u00f1a mediante un nuevo acuerdo con Repsol para instalar 133 MW en Arag\u00f3n\u00a0","datePublished":"2023-01-31T15:57:19+00:00","dateModified":"2023-03-10T10:54:52+00:00","mainEntityOfPage":{"@id":"https:\/\/aeeolica.org\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\/"},"wordCount":650,"commentCount":0,"publisher":{"@id":"https:\/\/aeeolica.org\/#organization"},"image":{"@id":"https:\/\/aeeolica.org\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\/#primaryimage"},"thumbnailUrl":"https:\/\/aeeolica.org\/wp-content\/uploads\/2023\/01\/Photo-by-Borja-Fasi-Fernandez_-NPI-Field-Engineer_GE-Renewable-Energy-scaled.jpg","articleSection":["Newsletter Enero 2023"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/aeeolica.org\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/aeeolica.org\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\/","url":"https:\/\/aeeolica.org\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\/","name":"GE Renewable Energy refuerza su posici\u00f3n en Espa\u00f1a mediante un nuevo acuerdo con Repsol para instalar 133 MW en Arag\u00f3n\u00a0 - Asociaci\u00f3n Empresarial E\u00f3lica","isPartOf":{"@id":"https:\/\/aeeolica.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/aeeolica.org\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\/#primaryimage"},"image":{"@id":"https:\/\/aeeolica.org\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\/#primaryimage"},"thumbnailUrl":"https:\/\/aeeolica.org\/wp-content\/uploads\/2023\/01\/Photo-by-Borja-Fasi-Fernandez_-NPI-Field-Engineer_GE-Renewable-Energy-scaled.jpg","datePublished":"2023-01-31T15:57:19+00:00","dateModified":"2023-03-10T10:54:52+00:00","breadcrumb":{"@id":"https:\/\/aeeolica.org\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/aeeolica.org\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/aeeolica.org\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\/#primaryimage","url":"https:\/\/aeeolica.org\/wp-content\/uploads\/2023\/01\/Photo-by-Borja-Fasi-Fernandez_-NPI-Field-Engineer_GE-Renewable-Energy-scaled.jpg","contentUrl":"https:\/\/aeeolica.org\/wp-content\/uploads\/2023\/01\/Photo-by-Borja-Fasi-Fernandez_-NPI-Field-Engineer_GE-Renewable-Energy-scaled.jpg","width":2560,"height":1440,"caption":"default"},{"@type":"BreadcrumbList","@id":"https:\/\/aeeolica.org\/ge-renewable-energy-refuerza-su-posicion-en-espana-mediante-un-nuevo-acuerdo-con-repsol-para-instalar-133-mw-en-aragon\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/aeeolica.org\/en\/inicio\/"},{"@type":"ListItem","position":2,"name":"GE Renewable Energy refuerza su posici\u00f3n en Espa\u00f1a mediante un nuevo acuerdo con Repsol para instalar 133 MW en Arag\u00f3n\u00a0"}]},{"@type":"WebSite","@id":"https:\/\/aeeolica.org\/#website","url":"https:\/\/aeeolica.org\/","name":"Asociaci\u00f3n Empresarial E\u00f3lica","description":"AEE Asociaci\u00f3n Empresarial E\u00f3lica","publisher":{"@id":"https:\/\/aeeolica.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/aeeolica.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/aeeolica.org\/#organization","name":"Asociaci\u00f3n Empresarial E\u00f3lica","url":"https:\/\/aeeolica.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/aeeolica.org\/#\/schema\/logo\/image\/","url":"https:\/\/aeeolica.org\/wp-content\/uploads\/2021\/08\/logo-aee.png","contentUrl":"https:\/\/aeeolica.org\/wp-content\/uploads\/2021\/08\/logo-aee.png","width":180,"height":78,"caption":"Asociaci\u00f3n Empresarial E\u00f3lica"},"image":{"@id":"https:\/\/aeeolica.org\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/aeeolica","https:\/\/x.com\/aeeolica","https:\/\/www.instagram.com\/aeeolica\/","https:\/\/www.linkedin.com\/in\/aee-asociaci\u00f3n-empresarial-e\u00f3lica-6830946b\/","https:\/\/www.youtube.com\/user\/AEEolica"]},{"@type":"Person","@id":"https:\/\/aeeolica.org\/#\/schema\/person\/064b26f21f7ed52e0b3854e6b52f9772","name":"Morante D\u00edaz, Mar\u00eda del Mar","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8bfd23e1c4bf5aa0b9314f1c5c9d644e62672831e6a512513954c3f15dffdd5a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8bfd23e1c4bf5aa0b9314f1c5c9d644e62672831e6a512513954c3f15dffdd5a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8bfd23e1c4bf5aa0b9314f1c5c9d644e62672831e6a512513954c3f15dffdd5a?s=96&d=mm&r=g","caption":"Morante D\u00edaz, Mar\u00eda del Mar"},"url":"https:\/\/aeeolica.org\/en\/author\/mar\/"}]}},"_links":{"self":[{"href":"https:\/\/aeeolica.org\/en\/wp-json\/wp\/v2\/posts\/104131","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aeeolica.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aeeolica.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aeeolica.org\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/aeeolica.org\/en\/wp-json\/wp\/v2\/comments?post=104131"}],"version-history":[{"count":0,"href":"https:\/\/aeeolica.org\/en\/wp-json\/wp\/v2\/posts\/104131\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aeeolica.org\/en\/wp-json\/wp\/v2\/media\/104129"}],"wp:attachment":[{"href":"https:\/\/aeeolica.org\/en\/wp-json\/wp\/v2\/media?parent=104131"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aeeolica.org\/en\/wp-json\/wp\/v2\/categories?post=104131"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aeeolica.org\/en\/wp-json\/wp\/v2\/tags?post=104131"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}