{"id":12207,"date":"2015-07-28T00:00:00","date_gmt":"2015-07-28T00:00:00","guid":{"rendered":"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/"},"modified":"2015-07-28T00:00:00","modified_gmt":"2015-07-28T00:00:00","slug":"zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015","status":"publish","type":"post","link":"https:\/\/aeeolica.org\/en\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/","title":{"rendered":"Zero wind power megawatts installed in Spain in the first half of 2015"},"content":{"rendered":"<p>The lack of activity in the domestic market endangers both the Government&#8221;\u2122s Energy Plan and compliance with 2020 European objectives. Spain is the OECD country that has registered a bigger growth in fossil fuel generation in the first four months; the electricity sector CO2 emissions have increased by 116%.<\/p>\n<p><!--more--><\/p>\n<p>\u20ac The lack of activity in the domestic market endangers both the Government&#8221;\u2122s Energy Plan and compliance with 2020 European objectives <br \/>&#8221; Spain is the OECD country that has registered a bigger growth in fossil fuel generation in the first four months; the electricity sector CO2 emissions have increased by 116%<br \/>&#8221; In order to recover investors trust, the announced 500 MW wind energy tender should come with changes of certain aspects of the Energy Reform<\/p>\n<p><em><strong>Madrid, 27th July 2015<\/strong><\/em>. The worst predictions have come true: Spain does not attract investment in new wind power capacity. In the first half of 2015, not a single megawatt has been installed in the country, leaving the total at 22,986 MW. This makes it harder to comply with the draft of the Government\u00b4s Energy Plan, which expects about 5,000 MW and 7 billion euro investment to meet European targets for 2020, which are binding.<\/p>\n<p>With electricity demand on the rise, the situation is worrisome: without new investments in clean technology, new electricity needs have to be covered with imported fossil fuels. In the first four months of the year, Spain is the OECD country that has registered a bigger increase in its fossil fuel electricity generation, according to the International Energy Agency (IEA). This has led to an increase in imports of 39% in coal and 32.8% in gas for electricity production in the period, according to the Customs database of Spain&#8221;\u2122s Ministry of Economy and Competitiveness. As a result, CO2 emissions in Spain have increased by 116%.<\/p>\n<p>After the summer, the Government will make public the terms of the 500 MW wind power tender intended to promote investment in the sector and return to the path of compliance with European objectives. According to the Spanish Wind Energy Association, restoring investor&#8221;\u2122s trust by correcting key aspects of the Energy Reform, including the possibility to modify economic conditions every six years and with them, the reasonable return, or the impossibility of wind farms to recover some of the deviations between the market price and the Government&#8221;\u2122s predictions, is crucial. Without these adjustments, it will be very difficult for investors to regain trust in our country and instal\u00f3 new wind farms. It is also necessary that the tender takes into account the reality of the sector, includes a fixed yield for the lifetime of the facility, and has clear rules, among other things.<\/p>\n<p>If the domestic market remains paralyzed (in 2014 only 27 MW were installed in Spain), the powerful Spanish wind energy industry will eventually leave the country. Export activity continues to rise (Spanish wind energy sector&#8221;\u2122s exports accounted for 418 million euro in the first quarter, representing an increase of 15.7% over the same period last year, according to the Ministry of Economy), but measures are needed to boost the domestic market and export capacity and increase the international presence of companies, as well as instruments that promote R&amp;D and encourage industrial development. If no action is taken to encourage the renewal of the 20,266 wind turbines installed in Spain, in 2020 50% will be more than fifteen years old and 20%, more than twenty years, which will mean a reduction of generated megawatts that will push the country further away from European objectives.<\/p>\n<p><img decoding=\"async\" class=\" size-full wp-image-12027\" src=\"https:\/\/aeeolica.org\/wp-content\/uploads\/2015\/07\/ico_pdf.jpg\" alt=\"\" width=\"16\" height=\"16\" \/> <a href=\"https:\/\/aeeolica.org\/wp-content\/uploads\/2015\/07\/150727_PRESS_RELEASE_Zero_wind_power_megawatts_installed_in_Spain_in_the_first_half_of_2015.pdf\">Download press release<\/a><\/p>\n<p>For further information:<br \/>+34 91 745 12 76<br \/><a href=\"mailto:comunicacion@aeeolica.org\">comunicacion@aeeolica.org<\/a><br \/><a href=\"http:\/\/www.aee\u00f3lica.org\">www.aee\u00f3lica.org<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The lack of activity in the domestic market endangers both the Government&#8221;\u2122s Energy Plan and compliance with 2020 European objectives. Spain is the OECD country that has registered a bigger [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[230],"tags":[],"class_list":["post-12207","post","type-post","status-publish","format-standard","hentry","category-archive"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Zero wind power megawatts installed in Spain in the first half of 2015 - Asociaci\u00f3n Empresarial E\u00f3lica<\/title>\n<meta name=\"description\" content=\"24331, Zero wind power megawatts installed in Spain in the first half of 2015, The lack of activity in the domestic market endangers both the Government&quot;\u2122s Energy Plan and compliance with 2020 European objectives. Spain is the OECD country that has registered a bigger growth in fossil fuel generation in the first four months; the electricity sector CO2 emissions have increased by 116%.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Zero wind power megawatts installed in Spain in the first half of 2015 - Asociaci\u00f3n Empresarial E\u00f3lica\" \/>\n<meta property=\"og:description\" content=\"24331, Zero wind power megawatts installed in Spain in the first half of 2015, The lack of activity in the domestic market endangers both the Government&quot;\u2122s Energy Plan and compliance with 2020 European objectives. Spain is the OECD country that has registered a bigger growth in fossil fuel generation in the first four months; the electricity sector CO2 emissions have increased by 116%.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/\" \/>\n<meta property=\"og:site_name\" content=\"Asociaci\u00f3n Empresarial E\u00f3lica\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/aeeolica\" \/>\n<meta property=\"article:published_time\" content=\"2015-07-28T00:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/aeeolica.org\/wp-content\/uploads\/2015\/07\/ico_pdf.jpg\" \/>\n<meta name=\"author\" content=\"Vicent\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@aeeolica\" \/>\n<meta name=\"twitter:site\" content=\"@aeeolica\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Vicent\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/\"},\"author\":{\"name\":\"Vicent\",\"@id\":\"https:\/\/aeeolica.org\/#\/schema\/person\/6a2517a04d4939d7b273a97e03ad2754\"},\"headline\":\"Zero wind power megawatts installed in Spain in the first half of 2015\",\"datePublished\":\"2015-07-28T00:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/\"},\"wordCount\":598,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/aeeolica.org\/#organization\"},\"image\":{\"@id\":\"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/aeeolica.org\/wp-content\/uploads\/2015\/07\/ico_pdf.jpg\",\"articleSection\":[\"AEE News Archive\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/\",\"url\":\"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/\",\"name\":\"Zero wind power megawatts installed in Spain in the first half of 2015 - Asociaci\u00f3n Empresarial E\u00f3lica\",\"isPartOf\":{\"@id\":\"https:\/\/aeeolica.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/aeeolica.org\/wp-content\/uploads\/2015\/07\/ico_pdf.jpg\",\"datePublished\":\"2015-07-28T00:00:00+00:00\",\"description\":\"24331, Zero wind power megawatts installed in Spain in the first half of 2015, The lack of activity in the domestic market endangers both the Government\\\"\u2122s Energy Plan and compliance with 2020 European objectives. Spain is the OECD country that has registered a bigger growth in fossil fuel generation in the first four months; the electricity sector CO2 emissions have increased by 116%.\",\"breadcrumb\":{\"@id\":\"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/#primaryimage\",\"url\":\"https:\/\/aeeolica.org\/wp-content\/uploads\/2015\/07\/ico_pdf.jpg\",\"contentUrl\":\"https:\/\/aeeolica.org\/wp-content\/uploads\/2015\/07\/ico_pdf.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/aeeolica.org\/en\/inicio\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Zero wind power megawatts installed in Spain in the first half of 2015\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/aeeolica.org\/#website\",\"url\":\"https:\/\/aeeolica.org\/\",\"name\":\"Asociaci\u00f3n Empresarial E\u00f3lica\",\"description\":\"AEE Asociaci\u00f3n Empresarial E\u00f3lica\",\"publisher\":{\"@id\":\"https:\/\/aeeolica.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/aeeolica.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/aeeolica.org\/#organization\",\"name\":\"Asociaci\u00f3n Empresarial E\u00f3lica\",\"url\":\"https:\/\/aeeolica.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/aeeolica.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/aeeolica.org\/wp-content\/uploads\/2021\/08\/logo-aee.png\",\"contentUrl\":\"https:\/\/aeeolica.org\/wp-content\/uploads\/2021\/08\/logo-aee.png\",\"width\":180,\"height\":78,\"caption\":\"Asociaci\u00f3n Empresarial E\u00f3lica\"},\"image\":{\"@id\":\"https:\/\/aeeolica.org\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/aeeolica\",\"https:\/\/x.com\/aeeolica\",\"https:\/\/www.instagram.com\/aeeolica\/\",\"https:\/\/www.linkedin.com\/in\/aee-asociaci\u00f3n-empresarial-e\u00f3lica-6830946b\/\",\"https:\/\/www.youtube.com\/user\/AEEolica\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/aeeolica.org\/#\/schema\/person\/6a2517a04d4939d7b273a97e03ad2754\",\"name\":\"Vicent\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/aeeolica.org\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9f0fea5e6bfa4d7107fbd7ea5e27d73cdca4f791f880e9f9f4171ecd42a7d395?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9f0fea5e6bfa4d7107fbd7ea5e27d73cdca4f791f880e9f9f4171ecd42a7d395?s=96&d=mm&r=g\",\"caption\":\"Vicent\"},\"sameAs\":[\"https:\/\/aeeolica.org\"],\"url\":\"https:\/\/aeeolica.org\/en\/author\/vicent\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Zero wind power megawatts installed in Spain in the first half of 2015 - Asociaci\u00f3n Empresarial E\u00f3lica","description":"24331, Zero wind power megawatts installed in Spain in the first half of 2015, The lack of activity in the domestic market endangers both the Government\"\u2122s Energy Plan and compliance with 2020 European objectives. Spain is the OECD country that has registered a bigger growth in fossil fuel generation in the first four months; the electricity sector CO2 emissions have increased by 116%.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/","og_locale":"en_US","og_type":"article","og_title":"Zero wind power megawatts installed in Spain in the first half of 2015 - Asociaci\u00f3n Empresarial E\u00f3lica","og_description":"24331, Zero wind power megawatts installed in Spain in the first half of 2015, The lack of activity in the domestic market endangers both the Government\"\u2122s Energy Plan and compliance with 2020 European objectives. Spain is the OECD country that has registered a bigger growth in fossil fuel generation in the first four months; the electricity sector CO2 emissions have increased by 116%.","og_url":"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/","og_site_name":"Asociaci\u00f3n Empresarial E\u00f3lica","article_publisher":"https:\/\/www.facebook.com\/aeeolica","article_published_time":"2015-07-28T00:00:00+00:00","og_image":[{"url":"https:\/\/aeeolica.org\/wp-content\/uploads\/2015\/07\/ico_pdf.jpg","type":"","width":"","height":""}],"author":"Vicent","twitter_card":"summary_large_image","twitter_creator":"@aeeolica","twitter_site":"@aeeolica","twitter_misc":{"Written by":"Vicent","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/#article","isPartOf":{"@id":"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/"},"author":{"name":"Vicent","@id":"https:\/\/aeeolica.org\/#\/schema\/person\/6a2517a04d4939d7b273a97e03ad2754"},"headline":"Zero wind power megawatts installed in Spain in the first half of 2015","datePublished":"2015-07-28T00:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/"},"wordCount":598,"commentCount":0,"publisher":{"@id":"https:\/\/aeeolica.org\/#organization"},"image":{"@id":"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/#primaryimage"},"thumbnailUrl":"https:\/\/aeeolica.org\/wp-content\/uploads\/2015\/07\/ico_pdf.jpg","articleSection":["AEE News Archive"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/","url":"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/","name":"Zero wind power megawatts installed in Spain in the first half of 2015 - Asociaci\u00f3n Empresarial E\u00f3lica","isPartOf":{"@id":"https:\/\/aeeolica.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/#primaryimage"},"image":{"@id":"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/#primaryimage"},"thumbnailUrl":"https:\/\/aeeolica.org\/wp-content\/uploads\/2015\/07\/ico_pdf.jpg","datePublished":"2015-07-28T00:00:00+00:00","description":"24331, Zero wind power megawatts installed in Spain in the first half of 2015, The lack of activity in the domestic market endangers both the Government\"\u2122s Energy Plan and compliance with 2020 European objectives. Spain is the OECD country that has registered a bigger growth in fossil fuel generation in the first four months; the electricity sector CO2 emissions have increased by 116%.","breadcrumb":{"@id":"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/#primaryimage","url":"https:\/\/aeeolica.org\/wp-content\/uploads\/2015\/07\/ico_pdf.jpg","contentUrl":"https:\/\/aeeolica.org\/wp-content\/uploads\/2015\/07\/ico_pdf.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/aeeolica.org\/zero-wind-power-megawatts-installed-in-spain-in-the-first-half-of-2015\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/aeeolica.org\/en\/inicio\/"},{"@type":"ListItem","position":2,"name":"Zero wind power megawatts installed in Spain in the first half of 2015"}]},{"@type":"WebSite","@id":"https:\/\/aeeolica.org\/#website","url":"https:\/\/aeeolica.org\/","name":"Asociaci\u00f3n Empresarial E\u00f3lica","description":"AEE Asociaci\u00f3n Empresarial E\u00f3lica","publisher":{"@id":"https:\/\/aeeolica.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/aeeolica.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/aeeolica.org\/#organization","name":"Asociaci\u00f3n Empresarial E\u00f3lica","url":"https:\/\/aeeolica.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/aeeolica.org\/#\/schema\/logo\/image\/","url":"https:\/\/aeeolica.org\/wp-content\/uploads\/2021\/08\/logo-aee.png","contentUrl":"https:\/\/aeeolica.org\/wp-content\/uploads\/2021\/08\/logo-aee.png","width":180,"height":78,"caption":"Asociaci\u00f3n Empresarial E\u00f3lica"},"image":{"@id":"https:\/\/aeeolica.org\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/aeeolica","https:\/\/x.com\/aeeolica","https:\/\/www.instagram.com\/aeeolica\/","https:\/\/www.linkedin.com\/in\/aee-asociaci\u00f3n-empresarial-e\u00f3lica-6830946b\/","https:\/\/www.youtube.com\/user\/AEEolica"]},{"@type":"Person","@id":"https:\/\/aeeolica.org\/#\/schema\/person\/6a2517a04d4939d7b273a97e03ad2754","name":"Vicent","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/aeeolica.org\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9f0fea5e6bfa4d7107fbd7ea5e27d73cdca4f791f880e9f9f4171ecd42a7d395?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9f0fea5e6bfa4d7107fbd7ea5e27d73cdca4f791f880e9f9f4171ecd42a7d395?s=96&d=mm&r=g","caption":"Vicent"},"sameAs":["https:\/\/aeeolica.org"],"url":"https:\/\/aeeolica.org\/en\/author\/vicent\/"}]}},"_links":{"self":[{"href":"https:\/\/aeeolica.org\/en\/wp-json\/wp\/v2\/posts\/12207","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aeeolica.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aeeolica.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aeeolica.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/aeeolica.org\/en\/wp-json\/wp\/v2\/comments?post=12207"}],"version-history":[{"count":0,"href":"https:\/\/aeeolica.org\/en\/wp-json\/wp\/v2\/posts\/12207\/revisions"}],"wp:attachment":[{"href":"https:\/\/aeeolica.org\/en\/wp-json\/wp\/v2\/media?parent=12207"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aeeolica.org\/en\/wp-json\/wp\/v2\/categories?post=12207"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aeeolica.org\/en\/wp-json\/wp\/v2\/tags?post=12207"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}